Analysis Period






Structural Number Calculation

Do-nothing Progression


IRI Progression Plot

IRI Progression Table

Treatment Plan Plot

Select the treatment activity for each analysis year. Routine maintenance is included by default in all years except Year 0. For treatment details, click here

Treatment Plan Details


Selected Treatment Plan

Construction & Maintenance costs

Initial Construction
Bituminous layer Granular layer Subgrade layer
Thickness (mm)
Surface layer Base layer
Base Sub-base
0.5 mm
Unit construction cost (₹/m³)
Each layer cost (₹/km/lane)
Total initial construction cost (₹/km/lane)
Total cost for each layer (₹)
Total cost for pavement (₹)
Routine maintenance
Crack Seal
Micro-surfacing
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Thin Overlay (≤ 40 mm)
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Thick Overlay (40–80 mm)
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Thin Inlay (≤ 40 mm)
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Thick Inlay (40–80 mm)
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Minor Rehabilitation
Bituminous surface layer Bituminous base layer
Thickness (mm)
Rate (₹/m³)
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Major Rehabilitation
Bituminous surface layer Bituminous base layer
Thickness (mm)
Rate (₹/m³)
Calculated cost (₹/km/lane):
Total treatment cost (₹):

Construction & Maintenance cost per km per lane

Output


Cash Flow Diagram

Vehicle Composition

Vehicle Type Fuel Cost (Cr.)
Standard car
Big car
Two wheeler
Light commercial vehicle
Two-axle truck
Multi-axle truck
Bus

Vehicle Operation Cost

Work Zone Table

Work-Zone User Cost Summary

Do-nothing Progression

M&R Strategy


Structural Number Constants



Do-nothing Progression Constants



M&R strategy Constants

Routine maintenance

Performance jump constants
If Increased IRI < 2.5
If Increased IRI is between 2.5 to 3.5
If increased IRI is between 3.5 to 5

Micro-surfacing

Performance jump constants
Age restoration constants

Thin Overlay (≤ 40 mm)

Performance jump constants
Age restoration constants

Thin Inlay (≤ 40 mm)

Performance jump constants
Age restoration constants

Thick Overlay (40–80 mm)

Performance jump constants
Age restoration constants

Thick Inlay (40–80 mm)

Performance jump constants
Age restoration constants

Minor Rehabilitation

Performance jump constants
Age restoration constants

Major Rehabilitation

Performance jump constants
Age restoration constants

Structural Number Calculation

Do-nothing Progression


IRI Progression Plot

IRI Progression Table

Treatment Plan Plot

Please select treatment plan below (Routine maintenance is always included except for year 0)

Treatment Plan Details


Selected Treatment Plan

Initial Construction and M&R Costs

Initial Construction
Bituminous layer Cement-treated layer Subgrade layer
Thickness (mm)
Surface layer Base layer
Base Sub-base
0.5 mm
Unit construction cost (₹/m³)
Each layer cost (₹/km/lane)
Total initial construction cost (₹/km/lane)
Total cost for each layer (₹)
Total cost for pavement (₹)
Routine maintenance
Crack Seal
Micro-surfacing
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Thin Overlay (≤ 40 mm)
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Thick Overlay (40–80 mm)
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Thin Inlay (≤ 40 mm)
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Thick Inlay (40–80 mm)
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Minor Rehabilitation
Bituminous surface layer Bituminous base layer
Thickness (mm)
Rate (₹/m3)
Calculated cost (₹/km/lane):
Total treatment cost (₹):
Major Rehabilitation
Bituminous surface layer Bituminous base layer
Thickness (mm)
Rate (Rs/m3)
Calculated cost (₹/km/lane):
Total treatment cost (₹):

Construction & Maintenance cost per km per lane

Output


Cash Flow Diagram

Vehicle Composition

Vehicle Cost by Type

Vehicle Type Fuel Cost (Cr.)
Standard car
Big car
Two wheeler
Light commercial vehicle
Two-axle truck
Multi-axle truck
Bus

Vehicle Operation Cost

Work Zone Table

Work Zone Cost Table

Do-nothing Progression

M&R Strategy


Structural Number Constants



Do-nothing Progression Constants



M&R strategy Constants

Routine maintenance

Performance jump constants
If Increased IRI < 2.5
If Increased IRI is between 2.5 to 3.5
If increased IRI is between 3.5 to 5

Micro-surfacing

Performance jump constants
Age restoration constants

Thin Overlay (≤ 40 mm)

Performance jump constants
Age restoration constants

Thin Inlay (≤ 40 mm)

Performance jump constants
Age restoration constants

hick Overlay (40–80 mm)

Performance jump constants
Age restoration constants

Thick Inlay (40–80 mm)

Performance jump constants
Age restoration constants

Minor Rehabilitation

Performance jump constants
Age restoration constants

Major Rehabilitation

Performance jump constants
Age restoration constants

Structural Parameter (STRUC)

Do-nothing Progression


IRI Progression Plot

IRI Progression Table

Treatment Plan Plot

Please select treatment plan below (Routine maintenance is always included except for year 0)

Treatment Plan Details


Selected Treatment Plan

Longitudinal Crack Length

Transverse Crack Length

Transverse Crack Number

Fault

Spall

Initial Construction and M&R Costs

Initial Construction
PQC DLC Sub-base Subgrade
Thickness (mm)
Unit construction cost (₹/m³)
Layer cost (₹/km/lane)
Total initial construction cost (₹/km/lane)
Total cost for pavement (₹)
Routine maintenance
Crack sealing unit rate (₹/m)
Joint resealing unit rate (₹/m)
Costs are dynamic
PDR
Rate (₹/slab)
Costs are dynamic
Crack stitching
Rate (₹/m)
Costs are dynamic
Full depth repair (half width)
Rate (₹/slab)
Costs are dynamic
Slab jacking
Rate (₹/slab)
Costs are dynamic
Diamond grinding
Rate (₹/m²)
Costs are dynamic
FDR
Rate (₹/slab)
Costs are dynamic

Output


Cash Flow Diagram

Vehicle Composition

Vehicle Cost by Type

Vehicle Type Fuel Cost (Cr.)
Standard car
Big car
Two wheeler
Light commercial vehicle
Two-axle truck
Multi-axle truck
Bus

Vehicle Operation Cost

Work Zone Table

Work Zone Cost Table

Do-nothing Progression

M&R Strategy


Structural Number Constants

New
Old


Do-nothing Progression Constants

High Severity Longitudinal Cracks
High Severity Transverse Crack
High Severity Transverse Crack Numbers
Average Faulting
Transverse spalling numbers
IRI


M&R strategy Constants

PDR

Performance jump constants

PDR+Crack stitching

Performance jump constants

PDR+Crack stitching+Slab jacking

Performance jump constants

PDR+Crack stitching+Slab jacking+Diamond grinding

Performance jump constants

FDR

Performance jump constants

PDR+FDR (Half-width)

Performance jump constants