KGPLCCA
IIT Kharagpur
Analysis Period
Structural Number Calculation
Deterioration Model
IRI Progression Plot
IRI Progression Table
Treatment Plan Plot
Please select treatment plan below (Routine maintenance is always included except for year 0)
Selected Treatment Plan
Construction & Maintenance costs
|
Construction
|
||||||||||||
| Bituminous layer | Granular layer | Subgrade layer | ||||||||||
| Thickness (mm) |
|
|
0.5 m | |||||||||
| Finished product cost (Rs/m3) |
|
|
|
|||||||||
| Each layer cost (Rs/km/lane) |
|
|
|
|||||||||
| Total cost (Rs/km/lane) |
|
|||||||||||
| Total cost for each layer (Rs) |
|
|
|
|||||||||
| Total cost for pavement (Rs) |
|
|||||||||||
|
Routine maintenance
|
||||||||||||
| Crack Seal |
|
|||||||||||
|
Microsurfacing
|
||||||||||||
|
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
||||||||||
|
Thin overlay (<=40mm)
|
||||||||||||
|
|
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
|||||||||
|
Thick overlay (>=40mm)
|
||||||||||||
|
|
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
|||||||||
|
Thin inlay (<=40mm)
|
||||||||||||
|
|
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
|||||||||
|
Thick inlay (>=40mm)
|
||||||||||||
|
|
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
|||||||||
|
Minor rehabilitation
|
||||||||||||
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
||||||||||
|
Major rehabilitation
|
||||||||||||
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
||||||||||
Construction & Maintenance cost per km per lane
Output
IRI Progression Plot
IRI Progression Plot
Vehicle Composition
Work Zone Table
Work Zone Cost Table
Structural Number Constants
Deterioration Model Constants
Treatment Model Constants
Routine maintenance
Performance jump constants
If Increased IRI < 2.5
If Increased IRI is between 2.5 to 3.5
If increased IRI is between 3.5 to 5
Microsurfacing
Performance jump constants
Age restoration constants
Thin overlay (<=40mm)
Performance jump constants
Age restoration constants
Thin inlay (<=40mm)
Performance jump constants
Age restoration constants
Thick overlay (>=40mm)
Performance jump constants
Age restoration constants
Thick inlay (>=40mm)
Performance jump constants
Age restoration constants
Minor rehabilitation
Performance jump constants
Age restoration constants
Major rehabilitation
Performance jump constants
Age restoration constants
Structural Number Calculation
Deterioration Model
IRI Progression Plot
IRI Progression Table
Treatment Plan Plot
Please select treatment plan below (Routine maintenance is always included except for year 0)
Selected Treatment Plan
Construction & Maintenance costs
|
Construction
|
||||||||||||
| Composite layer | Granular layer | Subgrade layer | ||||||||||
| Thickness (mm) |
|
|
0.5 m | |||||||||
| Finished product cost (Rs/m3) |
|
|
|
|||||||||
| Each layer cost (Rs/km/lane) |
|
|
|
|||||||||
| Total cost (Rs/km/lane) |
|
|||||||||||
| Total cost for each layer (Rs) |
|
|
|
|||||||||
| Total cost for pavement (Rs) |
|
|||||||||||
|
Routine maintenance
|
||||||||||||
| Crack Seal |
|
|||||||||||
|
Microsurfacing
|
||||||||||||
|
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
||||||||||
|
Thin overlay (<=40mm)
|
||||||||||||
|
|
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
|||||||||
|
Thick overlay (>=40mm)
|
||||||||||||
|
|
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
|||||||||
|
Thin inlay (<=40mm)
|
||||||||||||
|
|
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
|||||||||
|
Thick inlay (>=40mm)
|
||||||||||||
|
|
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
|||||||||
|
Minor rehabilitation
|
||||||||||||
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
||||||||||
|
Major rehabilitation
|
||||||||||||
|
Cost/km/lane (Rs):
|
Total cost (Rs):
|
||||||||||
Construction & Maintenance cost per km per lane
Output
IRI Progression Plot
IRI Progression Plot
Vehicle Composition
Work Zone Table
Work Zone Cost Table
Structural Number Constants
Deterioration Model Constants
Treatment Model Constants
Routine maintenance
Performance jump constants
If Increased IRI < 2.5
If Increased IRI is between 2.5 to 3.5
If increased IRI is between 3.5 to 5
Microsurfacing
Performance jump constants
Age restoration constants
Thin overlay (<=40mm)
Performance jump constants
Age restoration constants
Thin inlay (<=40mm)
Performance jump constants
Age restoration constants
Thick overlay (>=40mm)
Performance jump constants
Age restoration constants
Thick inlay (>=40mm)
Performance jump constants
Age restoration constants
Minor rehabilitation
Performance jump constants
Age restoration constants
Major rehabilitation
Performance jump constants
Age restoration constants
Structural Number Calculation
Deterioration Model
IRI Progression Plot
IRI Progression Table
Treatment Plan Plot
Please select treatment plan below (Routine maintenance is always included except for year 0)
Selected Treatment Plan
Longitudinal Crack Length
Transverse Crack Length
Transverse Crack Number
Fault
Spall
Construction & Maintenance costs
|
Construction
|
||||
| PQC | DLC | Sub-base | Subgrade | |
| Thickness (mm) |
|
|
|
|
| Finished product cost (Rs/m3) |
|
|
|
|
| Each layer cost (Rs/km/lane) |
|
|
|
|
| Total cost (Rs/km/lane) |
|
|||
| Total cost for pavement (Rs) |
|
|||
|
Routine maintenance
|
||||
| Crack sealing rate (Rs/km) |
|
Joint sealing rate (Rs/joint) |
|
Costs are dynamic
|
|
PDR
|
||||
| Rate (Rs/m2) |
|
Costs are dynamic
|
||
|
Crack stitching
|
||||
| Rate (Rs/m) |
|
Costs are dynamic
|
||
|
Full depth repair (half width)
|
||||
| Rate (Rs/m2) |
|
Costs are dynamic
|
||
|
Slab jacking
|
||||
| Rate (Rs/slab) |
|
Costs are dynamic
|
||
|
Diamond grinding
|
||||
| Rate (Rs/m2) |
|
Costs are dynamic
|
||
|
FDR
|
||||
| Rate (Rs/m2) |
|
Costs are dynamic
|
||
Construction & Maintenance cost per km per lane
Output
IRI Progression Plot
IRI Progression Plot
Vehicle Composition
Work Zone Table
Work Zone Cost Table
Concrete - Calibration Module
Concrete - Calibration Module
This module will be included in the next version.